Wow! I can't believe I haven't blogged on here in over 2 weeks. So much is going on at the house right now, I'm not sure where to even begin! We have a roof and shingles now, windows and doors are in. The plumbing, electrical, structured wiring and HVAC and all doing their rough ins now. They have also been finishing up the screened in porch and grill deck, although they ran out of the Azek tongue and groove flooring and have been waiting for more to arrive. The siding is onsite and I would imagine they would be starting that soon as well. Next Friday we start shopping for granite for the kitchen!
Before we got shingles!
This is the style of door that will be throughout the house.
Door going out to screened porch.
Shingles!!
HVAC unit for the second floor.
Master Tub has been installed!
We've picked out our faucets for the house - they are all Delta from the Leland series. We will have stainless in the kitchen and Sara's bath and then Venetian bronze in the rest of the house. The tall faucet is for the guest bath where we are hoping to have a vessel sink on the vanity.
They have also completed our cabinet design for the kitchen which I'm not sure the drawings I have will do it justice. The cabinets will be painted except for the island which will be a dark espresso stain with some cool turned wood legs. There will be some frosted glass in the top cabinets and the pantry which is in the corner will have frosted glass as well. There will be enough seating on the island for at least 4.
They have also got all the design for the rest of the cabinetry as well, but I don't want to bore you with every drawing!
That's about all for now - we are working on deciding paint colors, vanity for the guest bath and vessel sink, ceiling fans, etc. We will also be working with the lighting person once the electrician finishes up. Hope you all have a great weekend!!
No comments:
Post a Comment